We graded the road by the Theater less than two months ago.
However, with all the rain and high water table especially around the theater where the land is filled, it didn't last long.
We will do it again in November once the water level recedes. If we do it now it will be the same in a couple of weeks and the grader is expensive to operate.
If every one wants to contribute for thier portion I can have the grader pass one time and do everything in one shot rather than having to send it up each time for each individual job.
If you want to contact the town board or come to some sort of agreement, we can arrange a contract where I can do it on a regular basis.
That is why I posted this to see what type of interest is there.