Dept of the Army (Texas) Seeks Construction Services in Belize
Department of the Army, Army Contracting Command, ECC, has issued a presolicitation notice (W912CL12R0003) for the construction services.
This presolicitation notice was posted on Oct. 14 and the response date is Dec. 30.
Contract, Tender Notice Type: Modified/Amendment
The NAICS code for this requirement is 236220.
Set Aside: N/A
Contracting Office Address: Mission Division (PARC Americas 410th CSB), 4130 Stanley RD, STE 320, Fort Sam Houston, TX 78234-6102
Place of Performance: Orange Walk-Corozal, Belize, Central America Orange, Walk-Corazal Orang, Walk-Corazal, BL 0000, BL
For more information go to:
https://www.fbo.gov/index?s=opportu...5103dcdf405fd4&tab=core&_cview=1 ================
Latrine Buildings for Double Head Cabbage and Hattieville Schools.The Contractor shall construct a 19'6"x 19'6" restroom and septic tank at two locations.
https://www.fbo.gov/index?s=opportu...7aa464dce68852387cb3997561e&_cview=0The Contractor shall construct a 49.85ft x 83.96 ft multi-purpose concrete court with roof cover to serve as a multipurpose facility for the Julian Cho Technical School of Punta Gorda, Belize at N16 13'40.2 and W88 56'08.2. As an option, the Contractor shall also construct a stage.
https://www.fbo.gov/index?s=opportu...3ac58b603d2af18aa8f98cea87c&_cview=0Las Flores Government School. Library Renovations: The renovation project will include replacing the ceiling tile (upon determining if there is any roof damage) and electrical systems to include outlets and receptacles, providing shelving and cubicles, ceiling fans, and painting interior and exterior of the building. If it determined that the roof requires repair, this will be completed prior to any renovations on the inside of the building. Initial assessment is the roof appears to be repairable. The building adjacent to the library will also requiring painting for continuity.
https://www.fbo.gov/index?s=opportu...f8eaea79820f6b3a3ddaea2453c&_cview=0The project consists of new construction of a Two -Story Family Care Building. New building construction includes: site preparation, foundation, slab, and walls for a 21x33 sq ft building . It also includes provision and installation of the roof, drop ceilings, doors, windows, electrical system, plumbing and sewer systems, cabinets, partition walls, wall and floor tiles, and paint.
https://www.fbo.gov/index?s=opportu...7a2428a38044aab2364654b8251&_cview=0