Third EIA held for North Ambergris Caye Water System and Sewage Collection and Treatment

The third consultation for the North Ambergris Caye Water System and Sewage Collection and Treatment Project was held on Thursday, February 4th at the Sunbreeze Conference Room. The presentation included the revised Environmental Impact Assessment (EIA) studies presented by the owner of Tunich Nah Consultancy (TNCE), Jose "Pepe" Garcia, as well as observation from Belize Water Services Limited (BWSL) and Department of Environment (DOE) personnel. The consultation proved positive, and if approved, the $60 million project will see much needed water and sewage services being installed in Northern Ambergris Caye.

The project was developed due to the fact that Northern Ambergris Caye has neither water or sewer services and the area is experiencing an increase in both residential and commercial development. With funding from the Government of Belize (GOB), the project's EIA was completed by Dillon Consulting Limited (DCL), a Canadian consulting firm in conjunction with TNCE. Work on the project commenced back in 2010, and after this consultation, the EIA report is up for revision by the National Environmental Appraisal Committee (NEAC) before a final decision is taken by the DOE.

According to Garcia, the EIA has proven to support the proposed design for the project. "Following the EIA we have identified adequate land for the development of the water and sewage plants. The area recommended is west of Mato Lagoon on Northern Ambergris Caye, and BWSL has managed to acquire 748 acres in that general area. From this area, water distribution and sewage collection will be serviced along the coastline between Palmero Point and the Sir Barry Bowen Bridge," explained Garcia. The project is expected to see the construction of a reverse osmosis desalination water treatment plant and water pump station, potable water transmission and distribution mains, gravity sewers and force main with pump stations and sewage treatment facility.

Click here to read the rest of the article and see more photos in the San Pedro Sun


Joined: Oct 1999
Posts: 84,397
Marty Offline OP
OP Offline

EIA for North AC Water System and Sewage Collection Treatment Project approved

After its final consultation on February 4, 2016, the Environmental Impact Assessment (EIA) for the North Ambergris Caye Water System and Sewage Collection and Treatment Project has received its preliminary approval. The project is now pending its Environmental Compliance Plan (ECP). The purpose of the project is to enhance the quality of life of the populace of Ambergris Caye while contributing to the protection of the eco-system. In addition, it is intended that it will help support the island's tourism package by providing quality service to the residents and resorts of Northern Ambergris Caye.

The project has a proposed budget of $60 million which the Government of Belize secured through a loan from the Caribbean Development Bank. The executing body for the project still remains in the hands of Belize Water Services (BWS), while Dillon Consulting Limited is yet to deliver the last design of the project. As soon as this is done, plans for the construction of the treatment plant will start and bids will be open for qualified contractors.

Jose 'Pepe' Garcia from Tunich Nah Consultancy stated that it is surprising why it has taken so long to get the green light. "This is a very important project for Northern San Pedro. They urgently need it," said Garcia. He added that the current practices used by most of the residents and resorts in that area are not the best, and continue dumping waste in the surrounding areas. "When the road was paved, many of the pipelines that would take the waste to the other side of the island were damaged, thus, worsening the situation. So it is urgent for this project to start," he said.

Due to the many changes made to the plans, the standards for its performance were also changed. According to Garcia, from the studies they made, the present water treatment plant in San Pedro Town is not meeting the required standards. As a result, this new plant that will be built in Northern Ambergris Caye will count with the 'Class 1 Waters' standard instead of the Class 2 previously recommended. This will be the first plant of its kind in the entire country of Belize. This upgrade in the water quality standard will provide top quality clean treated water, both beneficial for the environment and humans.

Garcia explained how the system will operate. "The proposed expansion project which entails a development of 12 miles north from the Sir Barry Bowen Bridge will centralize the sewage system that will treat the waters to tertiary levels before the effluents are disposed," he explained. "This would significantly reduce the severity and extent of impacts to the environment." He added that the area surrounding the project site is considered to be ecologically sensitive given the extensive coral reef, sea grass and mangrove habitats in the area. For this reason, there is a need to raise the standards of the treatment of effluents for the sake of the environment. However, he also indicated that due to the upgrade of the quality of treatment, the budget of the project might also increase and additional funds will need to be acquired.

According to Garcia the project still proposes to construct a reverse osmosis desalination water treatment plant. It will also include a water pump station, potable water transmission and distribution mains. Another component that remains unchanged is gravity sewers and force main with pump stations and sewage treatment facility. "The monitoring plan made for this project is also helping to assess the effectiveness of the proposed mitigation measures," he said. "Certainly this will be of great assistance for the scripting of an ECP by the Department of the Environment." He acknowledge the fact that there will be some changes to the surroundings, but if the project is not executed as soon as possible, the surrounding ecosystem will continue to endure the negative impacts of improper disposal of waste. "The lack of a sewage collection facility is currently causing contamination to the area and the pristine waters of the sea," he said. "The project is vital for the success of the tourism business in that area since it is developing significantly fast. The accessibility of water distribution and sewage collection will improve the quality of service offered by businesses on that part of the island.

Click here to read the rest of the article in the San Pedro Sun


Joined: Oct 1999
Posts: 84,397
Marty Offline OP
OP Offline
The latest update on the installment of a sewage treatment plant on the northern portion of the island remains on hold as both Government and BWSL are still working on final details. Most importantly, securing the $60 million dollars that the project will cost to finalize the plant design. It has been almost a year since this project for the north was given a preliminary green light when its Environmental Impact Assessment was approved in November of 2016. The sewage treatment plant is expected to be built about 12 miles north of the Sir Barry Bowen Bridge, and aside from treating raw waste, it will also count with a reverse osmosis desalination water treatment plant.

San Pedro Sun


Link Copied to Clipboard
March
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
Cayo Espanto
Click for Cayo Espanto, and have your own private island
More Links
Click for exciting and adventurous tours of Belize with Katie Valk!
Who's Online Now
0 members (), 302 guests, and 0 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums44
Topics79,199
Posts500,011
Members20,460
Most Online7,413
Nov 7th, 2021



AmbergrisCaye.com CayeCaulker.org HELP! Visitor Center Goods & Services San Pedro Town
BelizeSearch.com Message Board Lodging Diving Fishing Things to Do History
BelizeNews.com Maps Phonebook Belize Business Directory
BelizeCards.com Picture of the Day

The opinions and views expressed on this board are the subjective opinions of Ambergris Caye Message Board members
and not of the Ambergris Caye Message Board its affiliates, or its employees.

Powered by UBB.threads™ PHP Forum Software 7.7.5